render facciata lato via
render 2 lato via
render 3
render 4
render lato cortile
render 1 lato cortile
render 2 cortile
Balcone
Giardino
Balcone
Balcone
Salone
1/12
render 2 lato via
render 3
map icon

New build Penthouses and Apartments in Turin

TurinSanta RitaVia Mombasiglio, 32
€ 372,000 - € 582,000
3 - 4 rooms
from 120 m²
10 types

Note

Listing updated on 07/04/2024
Description

This description has been translated automatically by Google Translate and may not be accurate

reference: EK-108539461

"Harmony between comfort and style, YOUR NEW HOME in Santa Rita"

In the Santa Rita neighborhood, near via Tripoli, in via MOMBASIGLIO 32, a newly built residential building will be built consisting of five floors (6th above ground) in addition to a ground floor used as a condominium green area and garage and a basement used as cellars and garage. The building will consist of 10 residential units, all four-room apartments of large sizes with large balconies and terraces. Possibility to customize the internal spaces according to your needs. Presence of district heating, each apartment is equipped with underfloor heating with individual meters. Provision for air conditioning and burglar alarm. Wooden window frames with double glazing and automated roller shutters. Presence of photovoltaic panels for the production of energy in the common areas. Independent controlled mechanical ventilation ducted. Possibility to combine the accommodation with a single or double garage in length with prices starting from € 45,000 Expected energy class A3. Work has begun with the demolition of the pre-existing building, completion of work expected December 2025.--966f533fb9b18b499cfef0cbbf9ab5ee!

If you want to know more, you can talk to Mauro Barbieri.

Features
Type
Project
Contract
Sale - Download brochure
Unit
10 residential
Start and end date
03/01/2024 - 12/30/2025
Building floors
5
Rooms
3 - 4
Garage, car parking
15 in garage/box
Heating
Central, floor heating, powered by district heating
Air conditioning
System predisposition
Other features
  • Bicycle parking
  • Window frames in double glass / wood
Work progress
Sono iniziati i lavori con la demolizione del fabbricato preesistente e la realizzazione delle fondamenta. Fine lavori prevista dicembre 2025.
Type and prices
Energy efficiency

Energy consumption

≥ 3,51 kWh/m² year, almost zero energy buildingA3

Discover every corner of the property
+9 photos
Additional options

Contact the advertiser